Screen Eye Care
Adjust screen warmth automatically, control display brightness, and get reminders to take a break.
Color temperature
Switch at sunrise and sunset, or at times you choose.
- Color temperature and software brightness together
- Smooth transitions instead of sudden changes
A smooth, scheduled transition
Break reminders
Choose how long to work and rest. Get a reminder when it's time.
Set up reminders and full-screen deferralAlways putting it off?
With anti-snooze enabled, snooze once per cycle. Full-screen breaks cannot be ended early in the app.
Screen brightness
Adjust each display from one panel.
- Detect displays again after reconnecting
- Adjust software brightness from 10% to 100%
External hardware brightness requires DDC/CI support from the monitor and its connection.
System theme switching
Light during the day. Dark at night.
- Switch at sunrise and sunset, or at fixed times
- Choose Windows and app themes separately in manual mode
- Temporary changes last until the next scheduled switch
Windows only. Apps must support and be set to follow the Windows system theme.
Set up automatic Windows theme switchingFocus mode
Keep your window bright and dim the area around it.
- Adjust background dimming from 10% to 85%
- Works across displays; the background stays clickable
- Pauses during breaks, temporary locks, and system lock
Starts off each time you launch; only the dimming level is saved. On macOS, it follows the foreground app's window order without screen recording or accessibility permission. Special floating windows may behave differently.
Keep your window bright and dim its surroundingsProduct information
| Names | Screen Eye Care / 屏幕护眼助手 |
|---|---|
| Developer | zero-ljz |
| Price | Free to use. No account required. |
| System and download | Windows 10+ / macOS 12+ (Apple Silicon / Intel). Windows via Microsoft Store; macOS via a universal installer. |
| Offline use | Everyday adjustments and break timers work offline. City search needs an internet connection. |
| Main limitations | External hardware brightness needs DDC/CI support from the monitor and connection. HDR may limit color temperature adjustments and software dimming. |
FAQ
How is it different from Windows Night light?
Windows Night light mainly makes screen colors warmer. Screen Eye Care also provides software dimming, hardware brightness control for compatible displays, and break reminders. If you only need warmer colors at night, the built-in feature may be enough. Using both can interfere with color temperature adjustments; if colors look wrong, turn one off and test again.
Why can't I adjust my external monitor's hardware brightness?
Screen Eye Care needs DDC/CI enabled on the monitor and a connection that passes control commands to adjust external hardware brightness. An unsupported monitor, disabled DDC/CI, or a dock or adapter that blocks these commands can prevent control. Check the monitor menu, try a direct connection, and detect displays again. Troubleshoot hardware brightness and software dimming separately.
Why doesn't color temperature adjustment work with HDR enabled?
HDR can bypass the Gamma color temperature adjustments used by the app; results depend on your display and graphics driver. Temporarily turn HDR off and compare the result. If only certain videos or apps are unaffected, protected video or hardware overlays may also be involved.
Will reminders continue after I close the window?
Yes. Screen Eye Care keeps dimming and reminders running by default when you close its main window. The app stays in the Windows tray or macOS menu bar. Reminders stop when you quit the app.
Does it need internet access or my location?
Screen Eye Care's everyday adjustments and timers work offline, and location permission is optional. Searching for a city contacts Open-Meteo; choosing Use current location on Windows or macOS requests system location permission for a one-time location lookup, without continuous tracking. You can instead enter coordinates manually or use a fixed-time schedule without a location.
Download
This is a Windows and macOS desktop app. Choose a download for your computer and install it there.
Linux is not supported. Install the Windows or macOS edition on its matching system.